THE CALCULATION OF THE PAYBACK PERIOD OF MEASURES TO IMPROVE THE CONDITION OF LABOUR ON THE EXAMPLE OF ENGINEERING ENTERPRISES

Sukovin Mikhail Vladimirovich1, Malakhov Ivan Igorevich2, Kocepalova Elena Viktorovna3
1Siberian state automobile and highway Academy, candidate of technical Sciences, docent of the Department "Technosphere safety"
2Omsk state technical University, candidate of technical Sciences, docent of the Department "Technology of mechanical engineering"
3LLC "Laboratory study of labor", director

Abstract
This article is devoted to determining costs associated with improving working conditions in production premises of the enterprise engineering. It is proposed to organize the acoustic processing of the production of space thus that conditions treated are valid. Introducing the event is analyzed from the point of economic effect. Define the costs and payback period of measures for labour protection.

Keywords: costs, labor protection, noise, payback time, working conditions


Category: 08.00.00 Economics

Article reference:
The calculation of the payback period of measures to improve the condition of labour on the example of engineering enterprises // Modern scientific researches and innovations. 2016. № 12 [Electronic journal]. URL: https://web.snauka.ru/en/issues/2016/12/75304

View this article in Russian

Sorry, this article is only available in Русский.



Artice view count: Please wait

All articles of author «Суковин Михаил Владимирович»


© If you have found a violation of copyrights please notify us immediately by e-mail or feedback form.

Contact author (comments/reviews)

Write comment

You must authorise to write a comment.

Если Вы еще не зарегистрированы на сайте, то Вам необходимо зарегистрироваться:
  • Register